Showing posts with label flooring. Show all posts
Showing posts with label flooring. Show all posts

Thursday, September 19, 2013

Flooring Update

Well friends, I am still alive and well, and baby is still cozy in my belly :) I thought I would have tons of time for blogging since I finished work last Friday, but turns out that I've been cooking, cooking, nesting, cooking, nesting! Today is an exciting day though - install for our tiling and baseboards starts (which means no oven until the tiling is done...so blogging it is).

Here is what we are going with for baseboards and tile:
 6x24 tiles in a charcoal colour
This will have shoe moulding added (new term for me too...basically a finishing piece on the bottom)

Yes, the flooring was installed more than a month ago...but these baseboard / tiling people are B-U-S-Y. So we're hoping the guy we have coming in can do the job cleanly and quickly so we can have some more normal life before #BabyGroupie (leave it to my friend Lindsey at Recreated to come up with a hastag for my baby - Lindsey IS the one who talked me into joining Twitter after all!). I'll have a #babygroupie post coming up to update everyone, and will post the finished photos of our main floor (finally) when it's done!

Thursday, August 8, 2013

Flooring is IN!

Wednesday was flooring install day - and it all got installed!

Woot!


Pretttaay exciting.

The first and last photos are most true to the colour...having them installed make all the work associated with demo disappear (we still have to clean up the basement though...) Now that the floor is in, we have to put in baseboards, do tiling for the kitchen and closet, and drywall / casing for our newly opened up hallway, but we're getting there. We will hire someone for the remainder of the work because the tiling will be finicky due to the radiators, and we want the baseboards and casing / drywall done right...now just to find said handy-person who can be available, at a reasonable cost, and done in early September...

Tuesday, August 6, 2013

Progress: Project Flooring

Another month, another blog post. I thought that I would have an easier time blogging of late, but life is just very busy. I'm working away at my day job and unfortunately that means that "free time" at night is spent on projects for the house, regular day to day chores, and sleeping. Oh, and some planning for the little human that will be joining us in the coming months. Until then....

Things are happening on the flooring front!! As part of our 2013 goals one of the longshots was re-doing flooring at least on the main floor. Why not do it when I'm 8 months pregnant? ;) Better than post baby, that I know FOR SURE. If you follow me on Instagram or Twitter you know some of the progress that was made this weekend (if you don't follow me, then you should, I am able to update those easier than updating the ol blog!).

All weekend the Mr worked away on the project (help from friends for demo day was greatly appreciated). My specialty was doing puzzles with plywood  measurements to ensure we got the most our of each sheet!

Here is the demo:



The living room and dining room demo was "easy" according to the guys - the trouble came in the hallway where there was hardwood on top of linoleum on top of plywood on top of another linoleum on top of plywood on top of floor planks. Yikes (they didn't get a chance to take a photo of that beauty).

The second demo photo shows some of the debris and mess caused by demo...which all fell through the floor plank cracks into our basement onto this:

Thank god I had some foresight and threw plastic over the china/crystal and a drop cloth over the dining chairs on Saturday morning before demo started. We still have a hell of a mess to clean up in and over other things, but at least some of it was spared and I don't think there is any damage (fingers crossed....). The day didn't finish without any damage though...the Mr. had to get a couple of stitches after getting caught in the face with a plank / nail during demo! He's OK and stitched up following a 3 hour wait at the hospital on Saturday night (I plucked some of the many many nails from the floor while he was getting stitched up...he pushed through the rest of the day so he could finish the demo before going to the hospital!).

Day 2 was picking up the plywood from our friends at Home Depot:
 Yes, I did get to drive that puppy around and it was great. The rest of the day was the Mr. and I pulling out some more nails, measuring, cutting, and laying plywood.


Monday was spent screwing in the plywood and doing some final measurements and cuts. It's amazing how much better it looks already!

If you have seen my house tour, you know that on our main floor we had the hallway blocked off with drywall and beatiful 80's glass blocks. We covered up this side of it with a dresser and mirror, and while that was nice for extra storage we are liking the airy feel of the house opened up, so I think we're going to keep the hallway!

Hardwood installers come later this week...can't wait to see it all done! We will be tiling the entry way and the kitchen with a dark gray tile...more on that to come (anyone know a good tiler / baseboard installer who isn't crazy busy into September??)

Related Posts Plugin for WordPress, Blogger...